Grundfos SQFlex pump with 6 pcs photovoltaic panels

Instalacija solarnih panela koji napajaju pumpu može biti na fiksnom nosašu, ili na nosaču sa dve zakretne ose koji u svakom trenutku prati putanju sunca. Ovim se postiže i do 50% veća iskorišćenost u odnosu na sistem sa fiksnim nosačem. Za ovaj sistem preporučuje se montaža od šest do osam solarnih panela na nosaču sa zakretnim pogonima.   

2020-02-27T21:34:44+01:00

Main design for hot water boiler automation Macedonia

In accordance with the requirements of the Investor "Production on heat Balkan Energy DOOEL", Skopje a detailed analysis of the current situation was carried out. This analysis has determined which equipment is suitable and can be retained, is not suitable and it is necessary to anticipate new and which equipment is missing and to be predicted from the aspect of the required level of automation of hot water boilers VKSM 60/1 and VKSM 60/5.

2020-02-27T21:28:25+01:00

Development of a project for monitoring of thermal power plants in Skopje

For the Investor "Balkan Energy Production LLCEL", Skopje, a preliminary design was made, which defined the necessary activities for the modernization of equipment, in order to provide full automation of the process of production of thermal energy at the "East" and "West" heat plants with the ultimate goal - the formation of a central the system of remote monitoring and control over thermal sources, as well as its connection with the central system of remote monitoring and control over the distribution of thermal energy (hot water and heat substations).

2020-02-27T20:14:35+01:00

Reconstruction project for drinking water treatment plant in Valjevo

The facility is divided into facilities as follows: - facility 1: clarification, chemical dosing, sludge treatment, energy - facility 2: clean water tank, filters, command center and laboratory - facility 3: compensation pools, distribution window and clean water tank for filter wash - facility 4: diesel unit There are six sand filters at the Cave Regional Water Treatment Plant.

2020-02-27T21:40:03+01:00

Main project for the modernization of process water in Skopje

In accordance with the requirements of the Investor "Production on heat Balkan Energy DOOEL", Skopje a detailed analysis of the current situation was carried out. This analysis has identified which equipment is suitable and can be retained, is not suitable and new equipment is required and which equipment is missing and needs to be predicted from the aspect of the required level of automation of the process water treatment system.