As part of the construction of the 10MW cogeneration plant at TO West, a complete reconstruction of the hot water pump pump was carried out. The old pump house was completely dismantled and a new 132kW frequency-controlled circulation pump was built in its place. The subject of the work was electrical installations of electric motor drive and control and monitoring. In addition to the aforementioned TPV circulation pumps, the electric motor drive also comprises 10 valves with electric motor drive. About 20 pressure and temperature gauges were installed for the purpose of forming the control and monitoring system for the TPV pumping station. The new plant was integrated into the existing SCADA platform, as well as into the existing common signal system based on DeviceNet communication and the pumping station was put into operation.